Gold Ore Processing Cost In Iran

Processing Grade And Recovery Rates The average grade of ore placed on the leach pad was 0.25 ounces per ton opt in 1998. For 1999, the average grade of ore placed on the pad is expected to be 0.11 opt. Gold recovery rates to date have been consistent with the anticipated lifeofmine rate of 80.